top of page

How Long Does Flooring Installation Take?

  • newcastleflooringn
  • Apr 14
  • 4 min read

Updated: Apr 15

When you think about home renovations, one key project that can dramatically change the look of your space is flooring installation. It can be a big commitment, and one of the most frequent questions asked by homeowners and builders alike is, "How long does flooring installation take?" The timeline can depend on various factors such as the type of flooring, the area size, and necessary prep work. Let’s break down the installation details for different flooring materials, including carpet, vinyl, laminate, and luxury vinyl tiles.


Installing new flooring
Installing new flooring

Understanding Flooring Installation Duration


Before getting into the specifics, it's crucial to understand the factors that can influence the timeline for flooring installation. Key elements include:


  • Area Size: Bigger spaces take longer to cover.

  • Subfloor Condition: A damaged subfloor may need extra time and repairs.

  • Installer Experience: Skilled installers can speed up the process significantly.

  • Seasonal Factors: Busy times of the year might delay scheduling.


For example, a flooring project scheduled before the holidays could see longer lead times.


Carpet Installation Time


Carpet installation can usually be done in 1 day or sometimes 2 days, but this range can vary. For a small bedroom, you can typically expect the process to wrap up in less than 30 minutes. However, larger areas such as an entire house may take 7-8 hours.


If the installation involves:

  • New underlay

  • new gripper and door strips

  • The removal of old flooring

  • Moving of furniture


These factors can add time to the overall process.


Gold stair runner and landing carpet
Gold stair runner and landing carpet

Vinyl Flooring Installation Time


Vinyl flooring is one of the quickest flooring options to install, typically taking around 1 to 2 days to complete. However, the exact time can vary depending on the room and level of detail required. For example, fitting vinyl in a simple square or rectangular room, like a hallway or living room, can often be completed in just a few hours.


Smaller, more awkward spaces such as bathrooms or toilets can take significantly longer due to the need for precise cuts around fixtures and fittings. In addition, sealing the edges with silicone to create a watertight finish—particularly in moisture-prone areas—adds extra time to the process but is essential for long-term durability and appearance.



Laminate Flooring Installation Time


Laminate flooring installation typically takes around 1 to 2 days, depending on the size and complexity of the project. Thanks to its user-friendly click-lock system, laminate is generally quicker to fit than traditional flooring options.


In a straightforward room layout, an experienced installer can lay approximately 90 square metres of laminate flooring in a full working day. However, if underlay needs to be fitted or old flooring must be removed first, this will naturally extend the installation time.


Another factor to consider is how the flooring will be finished at the edges. Using beading is usually quicker, as it is fitted over the edge of the laminate next to the skirting boards. If you choose to remove and then refit the skirting boards for a cleaner look, this adds more time and effort to the job.


Luxury Vinyl Tile Installation Time


Luxury vinyl tiles (LVT) are becoming increasingly popular thanks to their stylish appearance and impressive durability. LVT installation typically takes around 2 to 3 days, though this can vary depending on the size of the space and complexity of the design. If your project includes detailed layouts or patterns such as herringbone, expect the process to take longer due to the need for careful planning and precise cutting.


It's also important to note that in nearly all cases, the subfloor will require preparation before LVT can be installed. This usually involves either applying a layer of screed for concrete subfloors or fitting plywood boards over wooden ones to create a smooth, level surface. This essential step ensures a high-quality finish and prevents issues with the tiles later on, but it does add extra time to the overall installation.


Factors Influencing Installation Time


Size of the Area


The more square footage you need to cover, the longer the installation will take. Always consider the total area when estimating how long the process will last.


Condition of the Subfloor


If your subfloor requires levelling or repair, this prep work can add significant time to the overall installation, sometimes even doubling the estimated duration.


Type of Flooring


The flooring material plays a vital role in installation time. As previously mentioned, carpet and vinyl usually take less time than laminate or luxury vinyl tiles, which often require more skill and attention to detail.


Installer Experience


Hiring an installer with years of experience can save you time. For instance, skilled installers tend to complete jobs about 30% faster than less experienced counterparts, ensuring the job is done right the first time.


Weather Conditions


Extreme weather can also affect installation. High humidity may impact adhesives used in some flooring types, potentially requiring adjustments to the timeline.


Preparing for Installation Day


To help ensure that installation goes smoothly, homeowners should take a few preparatory steps. Start by clearing the installation area of any furniture and décor.


Additionally, confirm that the subfloor is clean and dry. This not only improves adhesion but also minimizes complications during the installation.


Summarising How Long Does Flooring Installation Take?


In summary, flooring installation timelines can vary widely based on several key factors, including the type of flooring and the complexity of the job. Here are the general timeframes:


  • Carpet: Takes around a day.

  • Vinyl Flooring and Laminate: Typically within 1 to 2 days.

  • Luxury Vinyl Tiles: Generally requires 2 to 3 days.


Understanding these timelines can help homeowners set realistic expectations and better prepare for their renovation project. Whether you're working on a single room or an entire house, clear communication and planning will lead to a more enjoyable experience.


With the right preparation, you will be enjoying your new flooring sooner than you think!

Comments


bottom of page